Lowest purchase cost among five steel pipes, fast delivery and complete specifications;
Easy to cut, bend and weld, convenient for on-site secondary processing;
Smooth surface with good adhesion for galvanizing and paint coating.
Weld seam reduces overall pressure resistance, unavailable for high-pressure and high-temperature medium transportation;
Poor fatigue resistance, easy to crack under long-term vibration;
Weld seam is vulnerable to rust in coastal high salt fog areas.
Minimum inner resistance for efficient water and gas transportation;
Balanced compression and torsion resistance without partial deformation;
Light weight, easy assembly and high turnover rate for construction scaffolding.
Curved surface leads to low flat fitting efficiency for plate connection;
Weak unidirectional bending resistance, not suitable for main vertical load-bearing columns;
Unstable stacking status and larger storage space occupation.
Flat four sides ensure high-precision welding and bolt connection;
Excellent vertical compression and bending resistance, 25% higher vertical bearing capacity than round pipe with the same wall thickness;
Space-saving stacking and neat appearance without extra decoration.
Large inner fluid resistance, not applicable for long-distance medium transportation;
Stress concentration on four corners, easy to deform under strong impact.
Dual-direction differentiated stress bearing, perfect for roof purlins and horizontal beams;
High space utilization rate, suitable for steel structures with limited floor height;
Higher overall rigidity and anti-deformation performance than standard square pipe.
Low universality, most special sizes need customized production;
Slightly higher material cost than ordinary square steel pipe.
20% higher pressure resistance than welded pipe, adapting to extreme high pressure, high temperature and low temperature environments;
Outstanding acid and alkali corrosion resistance, suitable for coastal and chemical industrial zones;
Excellent vibration and fatigue resistance, service life up to 50 years.
Complex production process with the highest procurement cost;
Insufficient spot supply and long production lead time;
High processing difficulty and expensive on-site construction cost.